Installation of escape route lighting in Unterinntal embankment

>> Download PDF <<

The installation of the escape route lighting in the Unterinntaltunnel from Baumkirchen to Radfeld (Austria) was finished June 27 2012. The 40 km long railroad tunnel was completely equipped with innovative LED solutions of SWAREFLEX, in order to increase safety in case of emergency. Over 25.000 SWARORAIL hand rail luminaires make for excellent lighting of escape routes, information and rescue signs as well as tunnel niches and control cabinets. SWARORAIL shines with optimum light quality, modularity and fast and easy mounting.

The OBB already realized test runs with up to 250km/h on the high speed route. The opening of the tunnel is scheduled for the end of the year.